Pre‑inspection prep

Pre‑inspection checks, before the inspector arrives.

Capture evidence, record measurements, run rule checks, export a report with code refs and missing items.

Report preview

Deck & railing

Pre‑Inspection Report

Evidence · Inputs · Findings

REVIEW
Evidence score72%

Baluster spacing may exceed limit

IRC R312.1.3

Missing photo: footings

Strengthens report confidence

Designed to read like a job document: clear status, references, and next actions.

01

How it works

A structured pre‑inspection workflow: evidence, inputs, review, report.

01

Add evidence

Upload photos and label key areas — guardrail, stairs, footings, ledger, or any category-specific view.

02

Enter measurements

Fill in dimensions and field data. Inline warnings flag issues as you type.

03

Run the review

The rule engine checks your inputs against code requirements and flags concerns. No AI, no guesswork.

04

Get the report

Project summary, evidence, measurements, and findings — one document to prep with or share.

02

Why decks and railings first

High failure impact, clear measurable rules, and fast evidence capture.

Failed inspections cost time and money. Decks and railings have clear, measurable rules that are straightforward to check before an inspector shows up. We start here so you get concrete, actionable guidance instead of vague advice.

Common checks

  • Guard height (36" min residential, 42" commercial)
  • Baluster spacing (4" sphere rule)
  • Stair rise / run dimensions
  • Ledger attachment documentation
  • Footing diameter and depth
03

Why contractors use PassBefore

It’s operational: fewer reschedules, less rework, cleaner handoff on inspection day.

Outcome

Fewer failed inspections

Catch guard height, baluster spacing, and footing issues before the inspector arrives.

Outcome

Less rework

Fix problems once — before they become a callback, a reschedule, or a change order.

Outcome

Show up prepared

Walk into inspection day with organized evidence and a clear picture of what might be flagged.

04

What you get (in one run)

Deliverables that make inspection day predictable.

Outcome

Fewer reschedules

Catch common misses early so the first inspection is more likely to pass.

Outcome

Cleaner handoff

One report to review with the crew or office — no hunting through texts and camera rolls.

Outcome

More confidence

Evidence and measurements stay attached to the finding, so decisions are easy to defend.

Deliverable

A report you can share

PDF output with severity, code refs, and clear next actions.

Deliverable

Evidence stays organized

Photos and context live where they’re referenced.

Deliverable

Measurements you can trust

Record critical dimensions once and reuse them across checks.

Deliverable

A clear ready/not-ready signal

See missing items before you’re on-site with an inspector.

05

FAQ

The most common questions we hear from contractors.

Is PassBefore an inspector replacement?

+

No. It’s a pre‑inspection checklist + rule check + report generator. You still pass/fail with the inspector.

Is this AI?

+

No. Checks are rule-based and auditable (inputs → rule → code reference).

What do I get at the end?

+

A PDF report: project summary, evidence index, measurements, findings (severity + code ref) and next actions.

What kinds of projects does this fit?

+

Today it’s focused on decks, guards, stairs, and railings — areas with measurable requirements and common inspection issues.

06

Sample findings

Findings are written like a report: severity, code reference, and recommended action.

Findings excerpt

Deck & railing

HighElevated deck without guardrail

Decks above 30" typically require a guardrail per IRC R312.1.

MediumBaluster spacing may exceed limit

Spacing may allow a 4" sphere to pass through per IRC R312.1.3.

LowMissing photo: footings

No footing photo was uploaded. Adding one strengthens your report.

07

Sample report

Project summary, evidence index, measurement table, findings (severity + code ref).

Output

Cover page, evidence index, measurement table, findings grouped by severity.

Open

ROUTE: /report/sample

View report

PassBefore provides pre‑inspection guidance for informational purposes only and does not guarantee inspection outcomes or replace a licensed professional or authority having jurisdiction.

08

Run the demo workflow

Evidence → measurements → rule checks → report export. No account required.

Demo

Open a seeded project or create a new one. The demo includes evidence, inputs, checks, and export.

Open

ROUTE: /demo

Open demo projects