Pre‑inspection prep
Pre‑inspection checks, before the inspector arrives.
Capture evidence, record measurements, run rule checks, export a report with code refs and missing items.
Report preview
Deck & railing
Pre‑Inspection Report
Evidence · Inputs · Findings
Baluster spacing may exceed limit
IRC R312.1.3
Missing photo: footings
Strengthens report confidence
Designed to read like a job document: clear status, references, and next actions.
How it works
A structured pre‑inspection workflow: evidence, inputs, review, report.
Add evidence
Upload photos and label key areas — guardrail, stairs, footings, ledger, or any category-specific view.
Enter measurements
Fill in dimensions and field data. Inline warnings flag issues as you type.
Run the review
The rule engine checks your inputs against code requirements and flags concerns. No AI, no guesswork.
Get the report
Project summary, evidence, measurements, and findings — one document to prep with or share.
Why decks and railings first
High failure impact, clear measurable rules, and fast evidence capture.
Failed inspections cost time and money. Decks and railings have clear, measurable rules that are straightforward to check before an inspector shows up. We start here so you get concrete, actionable guidance instead of vague advice.
Common checks
- Guard height (36" min residential, 42" commercial)
- Baluster spacing (4" sphere rule)
- Stair rise / run dimensions
- Ledger attachment documentation
- Footing diameter and depth
Why contractors use PassBefore
It’s operational: fewer reschedules, less rework, cleaner handoff on inspection day.
Outcome
Fewer failed inspections
Catch guard height, baluster spacing, and footing issues before the inspector arrives.
Outcome
Less rework
Fix problems once — before they become a callback, a reschedule, or a change order.
Outcome
Show up prepared
Walk into inspection day with organized evidence and a clear picture of what might be flagged.
What you get (in one run)
Deliverables that make inspection day predictable.
Outcome
Fewer reschedules
Catch common misses early so the first inspection is more likely to pass.
Outcome
Cleaner handoff
One report to review with the crew or office — no hunting through texts and camera rolls.
Outcome
More confidence
Evidence and measurements stay attached to the finding, so decisions are easy to defend.
Deliverable
A report you can share
PDF output with severity, code refs, and clear next actions.
Deliverable
Evidence stays organized
Photos and context live where they’re referenced.
Deliverable
Measurements you can trust
Record critical dimensions once and reuse them across checks.
Deliverable
A clear ready/not-ready signal
See missing items before you’re on-site with an inspector.
FAQ
The most common questions we hear from contractors.
Is PassBefore an inspector replacement?
+−
Is PassBefore an inspector replacement?
+−No. It’s a pre‑inspection checklist + rule check + report generator. You still pass/fail with the inspector.
Is this AI?
+−
Is this AI?
+−No. Checks are rule-based and auditable (inputs → rule → code reference).
What do I get at the end?
+−
What do I get at the end?
+−A PDF report: project summary, evidence index, measurements, findings (severity + code ref) and next actions.
What kinds of projects does this fit?
+−
What kinds of projects does this fit?
+−Today it’s focused on decks, guards, stairs, and railings — areas with measurable requirements and common inspection issues.
Sample findings
Findings are written like a report: severity, code reference, and recommended action.
Findings excerpt
Deck & railing
Decks above 30" typically require a guardrail per IRC R312.1.
Spacing may allow a 4" sphere to pass through per IRC R312.1.3.
No footing photo was uploaded. Adding one strengthens your report.
Sample report
Project summary, evidence index, measurement table, findings (severity + code ref).
Output
Cover page, evidence index, measurement table, findings grouped by severity.
Open
ROUTE: /report/sample
View reportPassBefore provides pre‑inspection guidance for informational purposes only and does not guarantee inspection outcomes or replace a licensed professional or authority having jurisdiction.
Run the demo workflow
Evidence → measurements → rule checks → report export. No account required.
Demo
Open a seeded project or create a new one. The demo includes evidence, inputs, checks, and export.
Open
ROUTE: /demo
Open demo projects